Part 135 Initial Training: How to Plan a New Pilot’s First 30 Days
Part 135 initial training: why the 30 days are yours, not the FAA’s
Consider a hypothetical. A chief pilot marks day 30 on the calendar as the release date for a new captain. The pilot finishes the classroom work on schedule, but nobody has booked the line check, and the operation’s commuter flying requires supervised operating experience before the pilot can be designated PIC. The release date slips. Part 135 initial training is defined by what a pilot must complete, not by a calendar.
What is Part 135 initial training? Part 135 initial training is the training a pilot must complete under an operator’s FAA-approved training program before serving as a crewmember, when the pilot has not previously qualified and served in the same capacity on that aircraft. It covers basic indoctrination, ground training, flight training, and required checks.
The Part 135 rules specify training subjects, program approvals, tests and checks, pilot qualifications, and, in some operations, operating experience. They do not set a universal new-hire calendar. A review of the current eCFR text of Part 135 Subpart H, retrieved November 10, 2026, found no general FAA requirement that onboarding be finished in 30 days. For operators required to maintain a training program, onboarding is governed by the FAA-approved program, and the timeline is whatever that program and the pilot’s progress produce.
A 30-day plan is still a useful operator planning convention. It forces sequencing, exposes scheduling bottlenecks, and gives a training manager a way to track progress. It works only if each phase is tied to the rule it satisfies.
What follows covers how to classify the pilot, a four-phase plan with its governing sections, the gap between training and release, documentation, special cases, and recent developments.
Before day one: decide which training category applies
Every Part 135 new hire training plan starts with a classification decision under § 135.321. The rule defines the categories as follows:
- Initial training: for crewmembers who have not qualified and served in the same capacity on an aircraft.
- Transition training: for crewmembers who have qualified and served in the same capacity on another aircraft.
- Upgrade and differences training: separate categories, generally for a crewmember moving to a new position or to a variation of an aircraft already flown.
The difference between Part 135 initial training and transition training turns on the pilot’s prior qualification and service, not on how long the pilot has been with the new employer. A new badge does not automatically mean a new-hire curriculum.
Two hypotheticals show how this works. A pilot who served as PIC on another aircraft at a previous certificate holder may fall under transition training rather than initial training. A former SIC moving to the left seat may need upgrade training. In both cases, the right answer depends on the facts of the pilot’s history and on how the operator’s program defines each curriculum.
Misclassification means delivering the wrong curriculum, which can leave required content uncovered or misstate what the pilot completed. The syllabus itself is controlled by the operator’s approved program. Under §§ 135.323 and 135.325, the FAA grants initial and final approval of a training program and its revisions before implementation. Those are the core Part 135 approved pilot training program FAA requirements, and a 30-day plan sits inside them.
A phase-by-phase plan for the first 30 days
The Part 135 pilot onboarding steps for the first 30 days can be grouped into four phases. The day ranges below are illustrative and come from operator planning practice, not from regulation.
Days 1 to 5: basic indoctrination
Section 135.329 requires basic indoctrination for newly hired crewmembers in the applicable training program. Part 135 indoc training is a regulatory training phase with defined content. It is distinct from an HR orientation. As applicable to the assignment, it covers crew duties and responsibilities, the relevant regulations, the certificate holder’s operating certificate and OpSpecs, and the appropriate portions of the operator’s manual. Operators commonly place operational control and flight-locating procedures here too.
This phase is also where operators can introduce crewmember emergency training under § 135.331 and crew resource management training under § 135.330. Both should be matched to the aircraft, its configuration, and the pilot’s assigned duties.
Any Part 135 pilot indoctrination training checklist should make company content explicit, because the § 135.293 knowledge test covers the operator’s own operations specifications and manual. A pilot cannot pass questions about material nobody taught.
Days 6 to 15: aircraft and operations ground training
Ground training must reflect the approved curriculum and the 14 CFR 135.345 pilot ground training subjects. As applicable, those include:
- Flight-locating procedures
- Weight and balance
- Runway limitations for takeoff and landing
- Meteorology
- ATC procedures and phraseology
- Navigation and approach procedures
- Communications
- Weather avoidance and escape
- Operating limitations
- Flight planning
- Normal and emergency procedures
- The approved Aircraft Flight Manual or equivalent
Ground-icing subjects apply only if the operator expects to authorize takeoffs in those conditions. Together with the § 135.327 written curriculum for each aircraft type, this list forms the core of the Part 135 initial training curriculum requirements.
Days 16 to 25: flight and device training
Sections 135.327 and 135.347 require training and practice in the maneuvers and procedures set out in the approved curriculum. The aircraft type training curriculum, rather than the instructor’s preference, defines what gets flown.
A flight simulation training device or other training device under Part 135 may be used only as the Part 135 rules and the operator’s approved program allow. If device time is planned for this window, availability needs to be confirmed at the hiring stage.
Operators may also add voluntary spatial-disorientation content in this phase. The FAA guidance behind that is covered later in this article.
Days 26 to 30: checks, records, and release
Depending on aircraft, position, and operation, the following may apply:
- The § 135.293 knowledge test and competency check
- The § 135.297 instrument proficiency check, for PICs operating under IFR
- The § 135.299 line check, for PICs
Whether a passed check equals release is a separate question, addressed in the next section.
Phase (illustrative) | Focus | Governing sections |
|---|---|---|
Days 1 to 5 | Basic indoctrination, emergency, CRM | §§ 135.329, 135.330, 135.331 |
Days 6 to 15 | Aircraft and operations ground training | §§ 135.327, 135.345 |
Days 16 to 25 | Flight and device training | §§ 135.327, 135.347 |
Days 26 to 30 | Tests, checks, records, and any commuter PIC operating experience | §§ 135.293, 135.297, 135.299, 135.244, 135.63 |
Training complete is not the same as released to fly
A signed-off curriculum shows the pilot was trained. It does not show the pilot is qualified for the specific flying the operator wants to assign. Part 135 pilot qualification is a separate verification.
The § 135.243 pilot requirements vary by operation. The section distinguishes certain passenger-carrying turbojet, 10-or-more-seat, and commuter cases from other VFR and IFR PIC operations. Certificates, ratings, flight experience, and instrument qualifications have to be checked against the operation the pilot will actually fly. A commercial certificate alone does not settle the question. SIC qualifications fall under § 135.245, which includes instrument-related requirements for SICs operating under IFR.
Section 135.343 requires completion of the applicable training phase before a crewmember serves. The Part 135 competency check for a new hire under § 135.293, along with any applicable instrument check, also has to be in place.
For PICs, the § 135.299 line check includes at least one route segment and takeoffs and landings at representative airports. The section also requires a procedure in the manual for pilots who have not flown a route and into an airport within the preceding 90 days. That procedure should be part of the release review.
The commuter PIC operating-experience trap
Section 135.244 adds a step for commuter operations. Before a pilot is designated PIC in a commuter operation, and after satisfactory ground and flight training, the pilot must complete operating experience under the supervision of a qualified check pilot. The required hours are:
- 10 hours for single-engine aircraft
- 15 hours for multiengine reciprocating aircraft
- 20 hours for multiengine turbine aircraft
- 25 hours for turbojet airplanes
The hours can be reduced, to no lower than 50 percent of the requirement, by substituting one additional takeoff and landing for each hour of reduction.
This requirement applies to PICs in commuter operations, not to every on-demand pilot. Where it does apply, schedule it and the check airman early. Left until the end, it can push PIC release past the planned date.
Documentation that holds up to an inspector
Section 135.63 calls for an individual record for each pilot. It covers qualification, assignment, medical information, tests and checks, flight time, and completion of each training phase. The specified pilot records are retained for at least 12 months.
The practical point is timing. Log each training phase as it closes, with the instructor or check airman sign-off and the date, rather than rebuilding the file the week of release. A record assembled after the fact is harder to verify and more likely to show gaps when an inspector compares it against the approved curriculum.
Special cases: one-pilot operators, 91K, and Part 125
- One-pilot certificate holders: Under § 135.341, a certificate holder that uses only one pilot is not required to establish the approved pilot training program otherwise required there, and § 135.343 carries its own one-pilot exception. Neither removes the qualification rules in §§ 135.243 to 135.245 or the testing requirements in § 135.293.
- Part 91K: Fractional programs have their own training rules, including §§ 91.1081, 91.1101, 91.1103, and 91.1107, with testing and checking under §§ 91.1065 and 91.1069. Section 91.1063 allows an authorized program manager to use the applicable Part 135 provisions instead, subject to that section’s conditions.
- Part 125: Section 125.1 sets its own applicability and excludes aircraft required to operate under Part 135. Its pilot rules, including §§ 125.281, 125.283, and 125.287, differ from Part 135 and are not interchangeable with it.
What’s changing around new-hire training
On January 22, 2026, the FAA issued InFO 26003. It recommends theoretical and practical spatial-disorientation training for Part 135, Part 91K, and Part 91 operators, using ground, simulator or device, and in-flight methods, along with procedures in the operator’s manual. The FAA describes the guidance as voluntary. It does not change existing obligations, though operators may choose to incorporate it into their approved program.
Under Part 5, existing Part 135 operators covered by § 5.9 must develop and implement a safety management system and declare compliance by May 28, 2027. This is an operator SMS obligation, not a new phase of pilot training.
H.R. 8226, introduced April 9, 2026, remained referred to the House Transportation and Infrastructure Committee as of the research date. It is not law. If enacted, it would apply Part 121-equivalent pilot qualification and training standards to covered turbine-helicopter passenger operations, excluding operations conducted exclusively under Subpart L for emergency medical services. Operators should recheck its status before acting on it.
The Air Carrier Training Aviation Rulemaking Committee (ACT ARC) adopted recommendation 26-2 in January 2026 and submitted it to the FAA for consideration. It addresses FAA guidance for approving training devices. It is a recommendation, not a requirement.
Questions training managers ask
How long does Part 135 initial pilot training take?
The answer depends on the approved curriculum, the pilot’s prior experience, the aircraft, and the availability of devices and check airmen. Two new hires at the same operator can finish at different times and both be compliant.
Does a generic type course cover it?
No. A type course may address aircraft subjects, but the company OpSpecs, manual, and indoctrination content still have to be delivered and documented under the operator’s program.
Can a check from a previous employer carry over?
It depends on the new operator’s approved program and records, under FAA oversight. Confirm the specific case with the principal operations inspector before counting on it.
Building a Part 135 initial training plan you can defend
A defensible plan follows a fixed sequence: classify the pilot, indoctrinate, train, check, verify qualifications and any operating experience, document, and release. The calendar is a management tool. The approved curriculum and the qualification rules determine when the pilot can fly.
The company-specific layer is where generic material helps least: the OpSpecs, the manual, operational control, and records that show each phase was completed. Part 135 initial training holds up best when that content is built around the operator’s own documents.
Operators looking for indoctrination and ground modules that can be tailored to their OpSpecs and manual can explore CTS Part 135 Training and map it to their approved curriculum. Part 91 and IS-BAO operators can see CTS IS-BAO/Part 91 Training.